November fixes
November’s small fixes, together.
With Always approve, a Gmail action that the connector can never apply anymore (because it lost it, or because it depends on one that was rejected) is withdrawn on its own and stops holding up the ones behind it. The ones that waited more than an hour behind it expire instead of being applied late (the activity shows them as rejected).
A scheduled task that’s running is no longer cut off when the agent tests its changes in the chat: it waits up to a minute for the task to finish.
The connections panel no longer shows Failed to load connections when the agent changes the project’s code or the page reconnects: it reloads on its own.